September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Electronic Air Bleed Control Valve (EBCV)
- Check for short circuit. Using an ohmmeter, check that there is no continuity between positive terminal (terminal closest to lock tab) and EBCV body. If there is continuity, replace EBCV.
- Check for open circuit. Using an ohmmeter, check that there is no continuity between positive terminal and other terminal. If resistance is not between 11-13 ohms at 68°F (20°C), replace EBCV.