Installation Procedure
Battery Distribution Fuse Block Retaining Tab (1) - Engage
- Battery Distribution Fuse Block (2) - Install
Battery Positive Cable (2) - Install
- Battery Positive Cable Nut (1) - Install and tighten 15 N.m (11 lb ft)
- Retainer (3) - Engage
Electrical Connector (1) - Connect [3x]
- Retainer (2) - Engage
Battery Positive Cable (3) - Install
- Battery Positive Post Clamp Nut (1) - Tighten 4.5 N.m (40 lb in)
- Battery Positive Post Cover (2) - Install
Battery Distribution Fuse Block Cover (3) - Install
- Battery Distribution Fuse Block Cover Retainer (1) - Engage [2x]
- Battery Distribution Fuse Block Cover Fastener (2) - Install and tighten
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection
CAUTION:
Refer to Fastener Caution