LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Buick >> 2007 >> Allure CXS >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Negative Cable Replacement (3.6L) >> Installation Procedure
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Installation Procedure

    Fig 1: View Of Battery Negative Cable-To-Engine Block Bolt
    GM887697Courtesy of GENERAL MOTORS CORP.
  1. Position the battery negative cable to the engine.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the battery negative cable to engine bolt.

    Tighten:  Tighten the battery negative cable to engine bolt to 50 N.m (37 lb ft).

  4. Fig 2: View Of Battery Area Mounts And Connectors
    GM772418Courtesy of GENERAL MOTORS CORP.
  5. Install the bolt (1) securing the battery negative cable to the side rail.

    Tighten:  Tighten the battery negative cable to side rail bolt to 36 N.m (27 lb ft).

  6. Connect the body harness connector (3) to the battery negative cable.
  7. Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection (3.8L)  or Battery Negative Cable Disconnection and Connection (3.6L) .