61 35 132 Removing and installing/replacing central gateway module
IMPORTANT:
Read and comply with notes on PROTECTION AGAINST ELECTROSTATIC DISCHARGE (ESD PROTECTION) .
Necessary preliminary work:
- Disconnect battery earth lead
- Disconnect both negative battery cables at F03
- Remove trim panel for pedal mechanism
Disconnect plug connection (1).
NOTE:
Cable shoe (4) is currently no longer installed.
If installed, release screw (2) and remove cable shoe (4).
If installed, release screw (2) and remove cable shoe (4).
Pull central gateway module (3) off equipment holder (5) in direction of arrow.
Installation note:
Make sure central gateway module (3) is correctly installed in equipment holder (5).
Replacement:
Carry out PROGRAMMING/ENCODING .
Perform FlexRay synchronization via path:
- Body
- Central Gateway Module
- Initialize FlexRay