DTC Troubleshooting: P0035(2.0L Engine): Inspection
ABV Open Wire Inspection
NOTICE:
Before disconnecting the PCM connector, jump the SCS line with the HDS, and wait more than 1 minute.
Test Procedure
- Preparation
-
- -
Turbocharger bypass control solenoid valve 2P connector: disconnected
- -
PCM connector E (80P): disconnected
- -
- Procedure
-
- -
Perform the inspection according to the following table.
- -
| (Disconnected) Turbocharger bypass control solenoid valve 2P connector female terminals | (Disconnected) PCM connector E (80P) - Refer to: PCM Connector for Inputs and Outputs(3.0L Engine) or PCM Connector for Inputs and Outputs(2.0L Engine) female terminals | ||||
| IG Mode |
|
|
Normal Conditions | ||
| ABV open wire inspection | OFF | There is less than 1 Ohm | |||
Results
- If abnormal, there is a problem in the circuit.
- If normal, there is a problem with the PCM.