LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2009 >> CC (357) V6-3.6L (BLV) >> Repair and Diagnosis >> Engine, Cooling and Exhaust >> Engine >> Timing Components >> Variable Valve Timing >> Variable Valve Timing Cover / Housing >> Service and Repair >> Control Housing Overview
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Housing Overview






Control Housing Overview






1 Guide Rail

Clipped onto the control housing.

2 Control Housing

3 Camshaft Adjustment Valve 1 (N205)

Removing and installing, refer to => [ Camshaft Adjustment Valves ] Camshaft Adjustment Valves.

4 Exhaust Camshaft Adjustment Valve 1 (N318)

Removing and installing, refer to => [ Camshaft Adjustment Valves ] Camshaft Adjustment Valves.

5 Bolt

8 Nm + an additional 90° (1/4) turn.

Install using liquid locking fluid (D 000 600 A2).

Checking the Strainer for Contaminants





- Unclip the strainer - 2 - from the rear of the control housing - 1 - and remove any possible contamination.