LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2012 >> Matrix FWD L4-1.8L (2ZR-FE) >> Repair and Diagnosis >> Maintenance >> Drive Belt >> Service and Repair >> Removal
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Removal





2ZR-FE ENGINE MECHANICAL: DRIVE BELT: REMOVAL

1. REMOVE NO. 2 CYLINDER HEAD COVER Removal

2. REMOVE ENGINE UNDER COVER RH

3. REMOVE V-RIBBED BELT

(a) Loosen bolts A and B.





(b) Loosen bolt C, then remove the V-ribbed belt.

NOTICE:
Do not loosen bolt D.