A/C Service Station Rob 134APF (And Other A/C Service Stations)
Refer to Workshop equipment information.
- Procedure: the operations "testing, extraction (recycling), evacuation and charging" are to be performed in line with the relevant operating instructions.
- The filters and dryers installed are to be replaced at the latest at the end of the period of use specified in the operating instructions and whenever the station has been drained (keep replacement filter to hand. available from equipment manufacturer, refer to operating instructions).
- Other A/C service stations or flushing equipment that is approved by VW but not illustrated here may also be used.
Refer to Workshop equipment information.
NOTE:
This A/C service station has the following known units: charging cylinder, pressure gauge set, vacuum pump, shutoff valves and charging hoses.
One quick-release coupling each (for service connections on high and low-pressure side) is included in the scope of delivery of this service station.