Cylinder Block Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Water Cooled, In-Line | 16.4 | 0.0 | A | Includes: R&R Engine, Disassemble, Clean & Inspect All Components, Renew All Bearings, Rings & Other Necessary Parts, Grind Or Renew Valves, Guides & Seats, Make All Necessary Adjustments. |
| Water Cooled, Opposed | ||||
| Manual Trans | ||||
| Without AC | 14.6 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components. |
| With AC | 15.4 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components. |
| Auto Trans | ||||
| Without AC | 15.5 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components. |
| With AC | 16.3 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components. |